• bg1

China Cheap Pole Band Suppliers – 500kV double loop termianl tower – X.Y. Tower


Product Detail

Product Tags

Related Video

Feedback (2)

We often stay with the principle "Quality Very first, Prestige Supreme". We have been fully committed to supplying our consumers with competitively priced high-quality goods, prompt delivery and skilled provider for High Voltage Substation, Monopole Cell Tower, Types Of Transmission Towers, Our business has been devoting that "customer first" and committed to helping shoppers expand their small business, so that they become the Big Boss !
China Cheap Pole Band Suppliers – 500kV double loop termianl tower – X.Y. Tower Detail:

Tower description

xytowers.com (1)

Transmission tower is a tall structure, usually a steel lattice tower, use to support an overhead power line. We render these products with the help of

diligent workforce having vast experience in this field. We go through detailed line survey, route maps, spotting of towers, chart structure and technique document while providing these products.

Our product covers the 11kV to 500kV while include different tower type for example suspension tower, strain tower, angle tower, end tower etc. 

Additionally, we still have a vast designed tower type and design service to be offered while if clients have no drawings.

Product name Transmission line tower
Brand X.Y. Towers
Voltage grade 550kV
Nominal height 18-55m
Numbers of bundle conductor 1-8
Wind speed 120km/h
Lifetime More than 30 years
Production standard GB/T2694-2018 or customer required
Raw Material Q255B/Q355B/Q420B/Q460B
Raw Material standard GB/T700-2006,ISO630-1995;GB/T1591-2018;GB/T706-2016 or Customer Required
Thickness angel steel L40*40*3-L250*250*25; Plate 5mm-80mm
Production Process Raw material test → Cutting →Molding or bending →Verification of dimensions →Flange/Parts welding →Calibration → Hot Galvanized →Recalibration →Packages→ shipment
Welding standard AWS D1.1
Surface treatment Hot dip galvanized
Galvanized standard ISO1461 ASTM A123
Color Customized
Fastener GB/T5782-2000; ISO4014-1999 or Customer Required
Bolt performance rating 4.8;6.8;8.8
Spare Parts 5% bolts will be delivered
Certificate ISO9001:2015
Capacity 30,000 tons/ year
Time to Shanghai Port 5-7 days
Delivery Time Usually within 20 days depends on demand quantity
size and weight tolerance 1%
minimum order quantity 1 set

detail (4)
detail (8)

Hot-dip galvanizing

Quality of Hot-dip galvanizing is one of our strength, Our CEO Mr. Lee is an expert in this field with reputation in Western-China. Our team has vast experience in HDG process and especially good at handling the tower in high corrosion areas.   

Galvanized standard: ISO:1461-2002.

Item

Thickness of zinc coating

Strength of adhesion

Corrosion by CuSo4

Standard and requirement

≧86μm

Zinc coat not be stripped and raised by hammering

4 times

detail (3)
detail (2)

Standard

X.Y. Tower has been strictly organizing production in accordance with the latest national standards since it’s establishment, and usually introduce American standards and European standards to improve product quality. The ISO series standards have been used throughout the entire business operations, we have successively obtained ISO9001, ISO14001, ISO45001 and related certificates.

Our chairman and general manager of the company personally take charge of the operation of the ISO series standards and organize at least two full-staff training sessions a year. Refine the employee implementation manual, and entrust the management representative to deal with violations in the operation of the system. Leaders value the participation of all employees.

In the early stage of the company’s construction, based on the concept of green and environmental protection, the planning and construction of the production workshop were carried out in strict accordance with the requirements of the “Environmental Assessment Approval” of the functional department. The infrastructure and equipment related to environmental protection are all in accordance with the “three simultaneous” principle, and the construction materials adopt environmentally friendly green materials, rain and sewage diversion and other scientific environmental protection programs. Environmental protection work has been continuously carried out in all aspects of the company’s production and operation. Raw materials are transferred to the waterproof and windproof warehouse in a timely manner after they enter the factory and pass the inspection. Production process: Use noise reduction molds, vegetable oil lubrication molds, and the welding workshop adopts single-machine exhaust and centralized purification and discharge, and the semi-finished products are transferred to be timely and efficient. Adhering to the people-oriented and green environmental protection work policy in daily management work, the company has successively established the “Company Environmental Protection Supervision Team” and “Equipment Environmental Protection Department” with the general manager as the team leader, and the environmental protection work is regarded as the A-level indicator evaluation item in the weekly work inspection.

The education of “Lucid waters and lush mountains are invaluable assets”always in our heart.

detail

Package and shipment

Every piece of our products is coded according to the detail drawing. Every code will be put a steel seal on each piece. According to the code, clients will clearly know a single piece belong to which type and segments.

All the pieces are properly numbered and packaged through the drawing which could guarantee no single piece missing and easily to be installed.

IMG_4759
IMG_4779
IMG_4833

Shipment

Normally, the product will ready in 20 working days after deposit. Then the product will take 5-7 working days to arrive at Shanghai Port.

For some countries or regions, like Central Asia, Myanmar, Vietnam etc., China-Europe freight train and carriage by land may be two better options of transportation. 

factory-(1)
factory-(2)
factory-(3)
IMG_4732
IMG_4742
IMG_4750


Product detail pictures:

China Cheap Pole Band Suppliers –  500kV double loop termianl tower – X.Y. Tower detail pictures


Related Product Guide:

With this motto in mind, we have become one of the most technologically innovative, cost-efficient, and price-competitive manufacturers for China Cheap Pole Band Suppliers – 500kV double loop termianl tower – X.Y. Tower , The product will supply to all over the world, such as: Paris, Iraq, Kenya, Customer satisfaction is our first goal. Our mission is to pursue the superlative quality, making continual progress. We sincerely welcome you to make progress hand in hand with us, and construct a prosperous future together.
  • The factory can meet continuously developing economic and market needs, so that their products are widely recognized and trusted, and that's why we chose this company.
    5 Stars By Joanna from Sydney - 2017.08.15 12:36
    Perfect services, quality products and competitive prices, we have work many times, every time is delighted, wish continue to maintain!
    5 Stars By Lulu from Tunisia - 2017.09.28 18:29

    Send your message to us:

    Write your message here and send it to us

    Send your message to us:

    Write your message here and send it to us