• bg1
  • We’re back!

    We’re back!

    In August, Chengdu was like a hot furnace, with the temperature reaching as high as 40 degrees. In order to ensure civilian power, the government restricted the use of industrial electricity. We have been limited to production for almost 20 days. At the beginning of Sept...
    Read more
  • XYTOWER | Basic Principle and Process Flow of Hot Dip Galvanization

    XYTOWER | Basic Principle and Process Flow of Hot Dip Galvanization

    During power transmission, the iron tower is a very important component. During the production of iron tower steel products, the production process of hot-dip galvanizing is generally adopted on the surface to protect the surface of steel products from the corrosion of e...
    Read more
  • XYTOWER | Power limitation in Sichuan

    XYTOWER | Power limitation in Sichuan

    The State Grid of Sichuan announced that from August 15 to August 20, the implementation scope of industrial enterprises providing power to the people will be enhanced in 19 cities of the province, and the business production of industrial power users in the normal power...
    Read more
  • XYTOWER | Shipment of DRC Iron Accessories Project

    XYTOWER | Shipment of DRC Iron Accessories Project

    Last Saturday, XYTOWER shipped 28 tons of iron accessories to the Democratic Republic of the Congo, of which 10 boxes were filled with hoop bolts, and other stay rods, angle steel, flat iron, etc. were packed according to the customer's requirements. The logistics compan...
    Read more
  • XYTOWER | Wanyuan 110kV Electric Transmission Towers Installation

    XYTOWER | Wanyuan 110kV Electric Transmission Towers Installation

    Recently, our salesmen Mr. Yu and Mr. Liu went to Wanyuan, Dazhou to supervise the on-site installation of the 110 kV power tower. The installation masters wore overalls, safety helmets and safety belts for safety protection. With the efforts of the workers, the power to...
    Read more
  • XYTOWER | 60M 3 Legged Telecom Tower Test And Assembly Succeeded

    XYTOWER | 60M 3 Legged Telecom Tower Test And Assembly Succeeded

    Last Saturday,With the help and efforts of all colleagues, we successfully assembled and tested the 60 meter angle steel communication tower sent to Malaysia, in order to ensure the quality of the iron tower,after the production of the iron tower is completed,the qualit...
    Read more
  • XYTOWER | Supervise The Delivery Of Communication Tower On Site

    XYTOWER | Supervise The Delivery Of Communication Tower On Site

    Recently, we mainly carry out the shipment of 70 m and 60 m communication towers in Malaysia. In the high temperature season, during the export packing, there is a large amount of warehousing work and a lot of sweating. Miss Qiu, the manager of our shipping department, r...
    Read more
  • XYTOWER | First Shipment of Malaysia Telecom Tower

    XYTOWER | First Shipment of Malaysia Telecom Tower

    Yesterday, the foreign trade team went to the galvanizing plant to supervise and test the first shipment of the 76 meter communication tower project in Malaysia. Three trucks with a total weight of 80 tons were loaded.
    Read more

Send your message to us:

Write your message here and send it to us