• bg1

330kv Transmission Line Steel Tower

Tower Type: Tubular Steel Tower Voltage: 10KV-500kV Material: Steel Q235/Q355/Q420 Quality Control: ISO9001:2008 Length of per section: Within 13M once forming Suit for: Electric Power Transmission and Distribution


Product Detail

Video

Product Tags

XYTOWER :

Professional Steel Towers Manufacturer and Exporter

公司 (2)

X.Y Towers is a leading company of high voltage transmission line in south west China.

Established in 2008,as a manufacture and consulting company in field of Electrical and Communication Engineering,it has been providing EPC solutions to the growing demands of Transmission and Distribution(T&D)sector in the region.

Since 2008,X.Y towers has been involved in some of the largest and most complicated electrical construction projects in China. After 15 years of steady growth.we provide array of services within electrical construction industry which includes design and supply of transmission & distribution lines and electrical substation.

  DESIGN SPECIFICATION:

Product
Power Electric Transmission Line Steel Tube Tower
Height
From 10M-100M or according to client’s requirement
Suit for Electric Power Transmission and Distribution
Shape Polygonal or Conical
Material
Normally Q255B/Q355B
Power Capacity 10kV 11kV 33kV 35kV 66kV 110kV 132kV 220kV 330kV 500kV or other customized voltage
Tolerance of the dimension
According to client’s requirement
Surface treatment
Hot-dip-galvanized following ASTM123, or any other standard
Joint of Poles Slip joint, flanged connected
Standard ISO9001:2015
Length of per section Within 13M once forming
Welding Standard AWS(American Welding Society)D 1.1
Production Process Raw material test-cutting-bending-welding-dimension verify-flange welding-hole drilling-sample assemble-surface clean-galvanization or power coating /painting-recalibration-packages
Packages Packing with plastic paper or according to client’s requirement
Life Period More than 30 years, it is according to installing environment

  PRODUCT SHOWS:

 For power transmission towers in various situations, you are welcome to come for customized consultation, professional design team and one-stop service are provided!

 We need customers to provide the following basic parameters: wind speed, voltage level, line return speed, conductor size and span

steel tube
11 (2)_副本

  MATERIALS:

In order to ensure the product quality, we start from the procurement of raw materials. For the raw materials, angle steel and steel pipes required for product processing, our factory purchases the products of large factories with reliable quality throughout the country. Our factory also needs to inspect the quality of raw materials to ensure that the quality of raw materials must meet national standards and have the original factory certificate and inspection report.

6_副本00

  ADVANTAGES:

1. An authorized supplier in Pakistan, Egypt, Tajikistan, Poland, Panama and other countries;

   China Power Grid Certification supplier, you can safely choose and cooperate;

2. The factory has completed tens of thousands of project cases so far, so that we have a wealth of technical reserves;

3. Facilitating supports and low labor cost make the product price have great advantages in the world.

4. With a mature drawing and drawing team, you can rest assured of your choice.

5. Strict quality control system and abundant technical reserves have created world-class products.

6. We are not only manufacturers and suppliers, but also your partners and technical support.

  ASSEMBLY & TEST OF STEEL TOWERS:

After the production of the iron tower is completed, in order to ensure the quality of the iron tower, the quality inspector shall conduct assembly test on it, strictly control the quality, strictly control the inspection procedures and standards, and strictly inspect the machining dimension and machining accuracy according to the provisions of the quality manual, so as to ensure that the machining accuracy of parts meets the standard requirements.

 

Other Services:

1. The customer can entrust a third-party testing organization to test the tower.

2. Accommodation can be provided for customers who come to the factory to inspect the tower.

  HOT DIP GALVANIZATION:

After assembly & test, the next step will be carried out: hot dip galvanizing, which aims at beauty, rust prevention and prolonging the service life of the steel tower.

The company has own galvanizing plant, professional galvanizing team, experienced galvanizing teachers for guidance, and processing in strict accordance with ISO1461 galvanizing standard.

The following are our galvanizing parameters for reference:

Standard
Galvanized standard: ISO:1461
Item
Thickness of zinc coating
Standard and requirement ≧86μm
Strength of adhesion Corrosion by CuSo4
Zinc coat not be stripped and raised by hammering 4 times

  PACKAGE:

After Galvanization,we start to package,Every piece of our products is coded according to the detail drawing. Every code will be put a steel seal on each piece. According to the code, clients will clearly know a single piece belong to which type and segments.

All the pieces are properly numbered and packaged through the drawing which could guarantee no single piece missing and easily to be installed.

1.3 (2)
1.1
1.4
1.3 (2)

  • Previous:
  • Next:

  • Send your message to us:

    Write your message here and send it to us

    Send your message to us:

    Write your message here and send it to us