The new construction of the 110kV line from Quxian Xicheng to Langya, Wire :JL/G1A-300/40-24/7 steel core aluminum stranded wire, ground wire:JLB20A-80, OPGW-24B1-80. Total length of the line is 29KM, the angle steel tower is 90 bases, Toatl weight is 550 tons. The order was  signed in September 2020 until delivery in October 2020, and the cycle was 35 days. It has been put into operation normally in early December 2020.