Hill area -35kV 2020.5

For the new construction project from 110kV Wumu Station to Longyanjing 35kV in Suining, Sichuan, the wire adopts JL/G1A-300/25 and the ground wire adopts OPGW-24B1-50. Total length of the line is 9.5KM, the angle steel tower and the steel pipe pole are 30 bases, Total weight is 260 tons. The order was signed in April 2020 to delivery in May 2020, and the cycle was 25 days. It has been put into operation normally in August 2020.